Parallel Mining News

Parallel Mining drills two m of 8.63 g/t Au at Mane II

2019-02-20T22:52:12+00:00 February 20, 2019|Parallel Mining|

Vancouver, British Columbia – Parallel Mining Corp. (TSX-V: PAL) (the “Company” or “Parallel”) announces that assay results have been received from the recent drilling program designed to test one of the areas of Mane II, the Company’s 163 square kilometer optioned concession in the Kaya-Goran greenstone belt in central Burkina Faso, approximately 20 kilometers south of Nordgold’s Bissa Gold Mine.

In total, 732 meters in 10 reverse circulation holes were drilled in the southwestern part of the property to test whether high grade gold mineralization at surface extends at depth. Historical results from artisanal reject material, sampled and reported by High River Gold, include gold grades of 20.0 grams per tonne (“gpt”) and 11.2 gpt. In 2017, Parallel Mining conducted a small grab sample program (27 samples) on the artisanal reject material and results included 16.7 gpt, 12.5 gpt, 7.9 gpt, 6.3 gpt, and 6.0 gpt.

The quartz vein being exploited by the artisanal workers hosted in a felsic intrusive (granite), and Evidence of this veining was noted in most of the drill holes although gold values fluctuated. Significant values from this drilling include:

Hole # Azimuth Dip From (m) To (m) Interval (m) Au Grade (gpt)
MRC18-001 360 -50 79.0 82.0 3.0 1.6
incl. 81.0 82.0 1.0 4.61
MRC18-002 360 -50 41.0 44.0 3.0 2.00
incl. 41.0 42.0 1.0 4.59
MRC18-006 180 -50 91.0 95.0 4.0 2.97
incl. 93.0 94.0 1.0 7.98
MRC18-007 360 -50 28.0 30.0 2.0 8.63
MRC18-008 360 -50 26.0 27.0 1.0 1.33

* From cross sectional analysis it is estimated that the true widths approximate 75% of reported widths.

“We are excited by the hit ratio of the drill holes in this program. This is still early exploration for Parallel on the Mane II property, so seeing the continued evidence of gold like this is exceptionally encouraging.” Commented John Anderson, President and CEO “We look forward to doing further work on this concession, both at this target and at the other zones of interest.”

Parallel-Mining-PAL-Mane-II-Driling-Results

Qualified Person
Julia Singh P.Geo, an independent Qualified Person under NI 43-101, has reviewed and approved the technical data and contents of this release. Samples obtained during core drilling were transported directly to Actlabs in Ouagadougou (a fully accredited laboratory), Burkina Faso by Parallel Mining personnel for sample preparation. Samples were sorted, dried, crushed and prepped for final chemical analysis using ICP-MS and fire assay methods. Standards, blanks and duplicates were inserted regularly into the sample stream.

Parallel Mining Corp.
John Anderson
President & Chief Executive Officer
T: +1-604-218-7400
E: janderson@parallelmining.com